Putting Down Roofing Felt: A Complete Guide to Install Underlayment
The roofing felt, or underlayment, acts as a moisture barrier between the roof deck and shingles. Proper installation protects the attic from leaks, extends the life of the roof, and helps manage moisture during weather events. This guide provides step-by-step instructions, practical tips, and best practices for laying down roofing felt on typical residential roofs in the United States.
What Roofing Felt Is And Why It Matters
Roofing felt is a roll of paper or fiberglass material saturated with asphalt. It serves as a secondary protective layer beneath shingles, sealing small gaps and preventing wind-driven moisture from reaching the wooden deck. Felt comes in two main types: regular (10-15 lb) and synthetic underlayment. Synthetic options offer higher tear resistance and faster installation but can be more expensive. In areas with heavy rain, wind-driven snow, or wide temperature swings, proper underlayment installation significantly reduces the risk of leaks and interior damage.
Tools And Materials You’ll Need
- Roofing felt or synthetic underlayment (per square footage of the roof)
- Roofing nails or staples (as recommended by the underlayment manufacturer)
- Utility knife or scissors for cutting
- Chalk line or straight edge for straight courses
- Measuring tape and straightedge
- Ladder stabilizer and fall protection gear
- Sealant or flashing tape for edges and penetrations
- Hammer or stapler (for fasteners, depending on product)
Preparing The Roof Deck
Begin with a clean, dry surface. Remove old shingles, nails, and debris from the deck to ensure the felt adheres properly and lies flat. Inspect for damaged or warped boards and replace them. Dryness is essential; install underlayment only when the roof surface is dry to prevent trapping moisture. If there are protrusions like chimneys or vent pipes, ensure flashing details are ready to integrate with the felt. Clearing the deck reduces wrinkles and helps achieve a uniform, weather-tight seal.
Choosing The Right Orientation And Seams
Most installation guides call for unrolling felt from the lower edge of the roof and working upward. On most shingles, the felt should overlap the lower row by about 19-25 inches for standard courses, but always verify manufacturer guidance. On steep pitches, consider extra fasteners and timing to keep the membrane flat as you progress. Seams should be offset so that water naturally sheds from one course to the next. For roofs with many penetrations, plan the layout to minimize the number of seams in high-water areas.
Installing The Felt
Unroll the first course along the eave with a slight upward bend to avoid wrinkling. Secure using nails or staples along the edge first, then place fasteners every 12-24 inches as recommended. Use a chalk line to ensure the edge stays straight. Continue upward in horizontal rows, ensuring a consistent overlap of the upper course over the lower edge. For synthetic underlayment, follow manufacturer guidelines on fastener spacing and fastening pattern. Keep the surface smooth and wrinkle-free by gently pulling taut as you lay each section.
Overlaps, Fastening Pattern, And Edge Details
Typical overlaps are 19-25 inches for felt or the specified overlapped width for synthetic underlayment. Fasteners are placed along the top edge of each course and every 12-24 inches along the field, depending on product and climate. At roof edges, eaves, and rakes, use continuous fasteners to reduce wind uplift risk. Around valleys, hips, and corners, extra care is needed to prevent wrinkles. Seal exposed edges with compatible sealant or flashing tape to reinforce water resistance at seams and terminations.
Flashing, Valleys, And Penetrations
Roof penetrations—vents, chimneys, and skylights—require careful integration with the underlayment. Cut around each feature precisely and cover with flashing that extends onto the felt. In valleys, install a continuous felt strip or a high-performance synthetic layer that resists wrinkling. Ensure flashing sleeves, boot seals, and lead-to-roof joints are installed before shingles to maintain a seamless moisture barrier. The goal is to avoid gaps where water could migrate under the shingles.
Common Pitfalls And How To Avoid Them
- Wrinkles and air pockets: Remove wrinkles promptly; rework affected areas to prevent water pooling.
- Improper overlaps: Do not underlap or muffle seams; ensure consistent, manufacturer-specified overlaps.
- Inadequate fasteners: Use the recommended fastener type and spacing; windy regions may require more fasteners.
- Moisture trapped during installation: Only install on dry days; postpone if rain is forecasted.
- Unsealed edges: Seal edges with compatible products to prevent wind-driven moisture from lifting the membrane.
Maintenance, Inspection, And Replacement Considerations
Roof underlayment does not last as long as shingles and will wear over time. Schedule inspections after major weather events and at least twice per year to check for damage, lifting, or tears. Damaged sections should be repaired promptly to prevent water intrusion. If the felt shows widespread wear or repeated leaks, consult a roofing professional about replacing the underlayment or upgrading to a synthetic membrane with longer service life. Proper maintenance extends the life of the entire roofing system.